Sungai Samak Estate Offers Five Plots For AI Data Centre Campus At Tanjong Malim

Nov 26, 2026

Sungai Samak Estate is offering five plots totalling 376 acres near Tanjong Malim. The proposed AI data centre campus would pair computing halls with on-site renewable generation and explore local waterways for cooling, giving developers an alternative to assess alongside sites in Johor and Cyberjaya.

Kuala Lumpur, Malaysia, November 26, 2026 /NewsNetwork/ -- Sungai Samak Estate is offering five plots near Tanjong Malim for sale as a potential home for an integrated AI data centre campus. The offer puts 376 acres on the table for developers weighing where to build in Malaysia. The sale is for land, not a completed or approved campus.

The estate identifies the plots at https://sgsamak.com and places them about ten minutes from Tanjong Malim town centre, near Proton City. The campus concept would bring computing halls, on-site renewable generation and cooling infrastructure into one plan. Access to natural streams and rivers opens a cooling option for investigation; it does not confer a right to draw water.

The offer gives site selectors a concrete alternative to starting and ending a search in Johor or Cyberjaya. The Financial Times, citing Baxtel, counted 76 of Malaysia’s 187 operational and planned data centres in Johor. It also reported public concern over energy and water consumption. Those figures document the scale of the cluster, not the amount of power available at any particular address.

Cyberjaya also appears on the newspaper’s map of major hubs. Its place on that map gives buyers a useful benchmark. It cannot settle whether a particular plot there, or in Tanjong Malim, can support the electrical load of a proposed campus on the date its first tenant needs service.

In Singapore, a special feature in The Edge Singapore reported that Equinix and other data centre operators had signed long-term contracts for electricity supplies from Sembcorp. For the Malaysian proposal, the distinction is material: setting aside land for renewable generation is one decision; securing electricity through the night and during outages is another.

Inside the computing halls, the choice of equipment could affect how much of the estate a developer needs. McKinsey’s analysis of 800-volt direct current describes how moving power conversion closer to server racks could reduce losses. It also identifies new safety and training requirements. A new campus could allow for that change before cable routes and equipment rooms are fixed.

That decision affects not only the first installation but also the space left for later phases.

Water is the other early test. A stream visible on a map may look very different after weeks without rain. Seasonal flow measurements, flood mapping and the needs of downstream users would help determine whether local water could play any part in cooling. Engineers could then compare that option with systems that use less water.

For a buyer considering the five plots together, the immediate opportunity is to put those plans on the same map before committing to a layout. Space reserved for a river buffer cannot also house a substation. A route kept clear for a future power connection could determine where the first computing hall can stand.

Prospective buyers can direct requests for parcel plans, title particulars and site visits to https://sgsamak.com/contact-us. Those enquiries would give operators a basis for comparing the estate with shortlisted sites in established hubs, using the same power, water and delivery requirements for each.

Contact Info:
Name: Holly Lim
Email: Send Email
Organization: Sungai Samak Estate
Address: 2 Jalan Sempurna off Jalan Gombak , Kuala Lumpur, Federal Territory 53000, Malaysia
Website: https://sgsamak.com

Source: NewsNetwork

Release ID: 89211086

In case of identifying any problems, concerns, or inaccuracies in the content shared in this press release, or if a press release needs to be taken down, we urge you to notify us immediately by contacting [email protected] (it is important to note that this email is the authorized channel for such matters, sending multiple emails to multiple addresses does not necessarily help expedite your request). Our dedicated team will be readily accessible to address your concerns and take swift action within 8 hours to rectify any issues identified or assist with the removal process. We are committed to delivering high-quality content and ensuring accuracy for our valued readers.

More News

YOUR NEWS, OUR NETWORK.

Do you have Great News you want to tell the world?

Be it updates about your business or your community, you can make sure that it’s heard by submitting your story to our network reaching hundreds of news sites across 6 verticals.

ABOUT US
Logo

Market Fold features extensive coverage of Business and Finance News across the many nations for business leaders who seeks to discover strategy plans of successful businesses.

Contact us: sales[at]marketfold.com


SUBSCRIBE
Copyright © 2015 - 2026 Market Fold. All Rights Reserved.